Adventures of the Brown Family

Wednesday, September 20, 2006

Back Bath Attack - Part 2








And now I have layer 1 of 5 of the floor put in.
Tar paper next, then vertical wood, then backer board, and then finally tile.





Well, it took a hammer, pliers, screwdriver, and a reciprocating saw to get it out, but I finally got the drain out and replaced with new PVC. Hopefully that takes care of the drain leak.

With the tub now fixed and jacked back up to level and the studs replaced or added, I can now begin reflooring the bath. Then comes the backing and tile work. Woo hoo!!